Grant Street Pier Complete

The excerpt below is taken from the article Troy Brynelson wrote for The Columbian in January of 2018 in regards to the recent completion of Larry Kirkland's Grant Street Pier design as part of the Vancouver Waterfront Park. 

"Internationally known artist Larry Kirkland designed the pier with both form and function in mind. Permanent beams would disrupt the river too much, so his design channeled a ship to hang a V-shaped walkway from a 75-foot mast.

“It was just a suggestion in a meeting that I said I bet you could hold this up with a mast and get rid of the pilings,” Kirkland said. “Nobody wanted those.”

When asked how closely the nearly finished pier matched his vision, Kirkland said “I’m thrilled. I can’t wait to walk out there.”

The pier and two restaurant buildings along the shore at its sides are expected to open in July.

Kirkland, who is based in Washington D.C., flew in and visited the pier on Wednesday when the sky was a monochromatic gray. He said he realized how the pier will change with the weather.

“Against a blue sky it’s going to feel very different,” he said. “I think that’s the nice thing about it: as a static thing, it’s going to change as the sky around it changes.”

Crews now will turn their attention to building a 3,800-square-foot plaza that ties together the pier and the buildings. Made of concrete and basalt pavers, the plaza will include bench seating and plants."